Glazed sidelight, partially open. Obscure glass prevents overlooking of neighbour
Correct bifold window in action
The rear facade has been rendered and work is well underway on the front facade restoration. Here the fence capping has been stripped back to the raw brick. The fence and facade have been patched where necessary and have received their paint undercoat. Verandah roofing has been replaced and the replacement guttering and downpipes are in progress.
Rear facade
Front facade
Plumber has fitted the shower drainage outlet tray in anticipation of the tiling.
Shower outlet
Cabinetry is being progressively installed. The WIR is complete and vanity unit to downstairs bathroom is in place. The basin unit will sit above the cabinets and be fitted off by the plumber at a later date.
Vanity to bathroom
Builder anticipates that the steel stair framing will be ready next week, but treads likely to take longer.
¶ 3:52 PM