T1 Architect's Diary
Friday, August 06, 2004
Engineer's input

Sat down with the engineer today to discuss the roof changes. He is revising the ceiling structure above the front bedroom to take the weight of an in-roof water tank. Spent some time revising the guttering, flashing and downpipe details and discussing plumbing logistics with builder.